MIRNEWS.337 3 DECEMBER 1996
1st Spacewalk (EVA) crew 22d Main Expedition (M.E.) MIR:
Korzun and Kaleri did this EVA on 2.12.1996 between 1554
and 2151UTC (duration 5 hrs. 57 mins). They had to
deploy and connect cables to the American solarpanel on
the outersurface of Kvant-1. They accomplished their
task successfully and without problems. The solarpanel
has been checked and can deliver a current of 80 Amperes.
When MIR for the first time came within our range (orbit
61636, 2015-2022UTC) the cosmonauts were still working
near the Sofora girder. Somewhat later they returned to
the airlock. During the 2d pass for our position (orb.
61637, 2149-2159UTC) Korzun reported the closure of the
hatch at 2157UTC. Regularly John Blaha could be heard in
contacts with TsUP and the cosmonauts. Inside the MIR-
complex he assisted the cosmonauts, checked systems and
executed commands given to him by TsUP.
While Korzun and Kaleri were still in the airlock to
equalize the airpressure Blaha in coordination with TsUP
loaded control-data in the central computer.
On 3.12.1996 at abt. 0108UTC, everybody, your scribe
inclusive, though tired but satisfied, went to sleep.
2d EVA 22d M.E.:
This EVA is on schedule for 9.12.1996. During this EVA
Korzun and Kaleri will have to accomplish the following
tasks:
1st: The mounting of Rapana on the 3d trussconstruction
at the outersurface of the Kvant-1 module:
2d: The installation of a new Kurs-antenna on the
transitionsection (P.Kh.O.).
Chris v.d. Berg, NL-9165/A-UK3202
--- Maximus 2.01
---------------
* Origin: Scoop BBS (The Netherlands) +31-33-2996366 (2:500/202)
|