TIP: Click on subject to list as thread! ANSI
echo: old_engine
to: Craig Healy
from: Matt Mc_Carthy
date: 2002-11-24 02:50:38
subject: Pick-em-up E-test Results

23 Nov 2002, 17:53, Craig Healy (1:323/120), wrote to Alexander Bilan:

Hi Craig.

 ->> CH> I wonder just what the problem is?  Small compressor?

 ->> Probably a combination of things.
 ->> Safety nazi's probably the biggest roadblock.
 ->> Line limit perhaps.
 ->> Undersized unit to keep it "affordable".

 CH> Matt pointed out some of the practical aspects.  Tough nut to 
 CH> crack.

 ->> I do know for where I work, that the gas company has pumps that 
 ->> serve both the next door NG public card access station, and our 
 ->> building (Just guessin there are some 60-80 hookups (never bothered 
 ->> counting)) for the 'fast fill'

 CH> How long does the fast fill take?

If that "fast fill" is from a container of LNG, It would take the
same time as filling a similar sized propane tank.  Our power company
trucks down here run LNG also, and they have three tanks nested in a
triangle (like bombs in a rack) to run the truck.  The tanks are about six
feet long, and about 14" diameter, built like large oxygen bottles.

I just downloaded a text on LNG and will post as the next message.


     Good luck...  M.

--- Msged/386 TE 06 (pre)
* Origin: Matt's Hot Solder Point, New Orleans, LA (1:396/45.17)
SEEN-BY: 10/3 22 345 105/360 106/1 2 3 1234 2000 123/500 124/5025 128/187
SEEN-BY: 130/803 140/1 143/2 167/133 226/600 229/1000 2000 3000 267/200
SEEN-BY: 280/5003 333/0 379/1 1200 396/45 397/1 633/267 270 2404/201
SEEN-BY: 2624/306 3634/12 3800/1
@PATH: 396/45 106/2000 1 379/1

SOURCE: echomail via fidonet.ozzmosis.com

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.