| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 03:RE: [drakelist] R-4B question |
From: "Gerry"
Subject: RE: [drakelist] R-4B question
face=3D"Times New Roman">Removing tubes in the design reduced energy =
needed,
cut down on heating problems, and increased reliability. =
Cheers,
Al Link, K4ICL
ALink{at}K4ICL.com">mailto:ALink{at}K4ICL.com">ALink{at}K4ICL.com
139 Turner Circle
Greenville, SC 29609
864 420-4652
www.K4ICL.com<=">http://www.K4ICL.com">www.K4ICL.com<=
/p>
www.UREGS.org;">http://www.UREGS.org">www.UREGS.org; for
Equipment Condition Rating
Standards
* Origin: The Barter Board Internet Gatway (1:261/1551)SEEN-BY: 633/267 270 @PATH: 261/1551 1352 38 123/500 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.