12-03-20 18:47 August Abolins wrote to Mike Powell about Hydro went off - again
Howdy! August and Mike,

 AA> @MSGID: 
 AA> @REPLY: 
 AA> Hello Mike!

 AA> ** On Monday 30.11.20 - 15:55, Mike Powell wrote to AUGUST ABOLINS:

 >> It lasted about 24 hours. Other regions had it worse (up
 >> to 3 or 4 days without electric power). A few people
 >> operate generators.

 MP> LOL, I read that as "water" not "hydroelectric."  Would
 MP> not want to be without the former for long but, now that
 MP> Winter is upon us, being without the electric is more
 MP> worrisome.

 AA> "Hydro" is part of the name of the Canada-wide service company
 AA> that manages the electric (and nuclear) power facilities.
 AA> Canadians are used to using the term "hydro" when we refer to
 AA> the electricity services to our homes.

Down the road from the Lock and Dam I worked at was a Hydroelectric Plant.

It was owned by Louisville Gas and Electric Company (Kentucky).
There were 8 Turbines (Units) in the building.
It was the only Hydro Plant in the area, all of the other Generating Stations
burnt Coal to run their Generators.

I was at work one day when a towboat locked through carrying a Hydro Unit
that was built in France that would be installed in Vanceburg, Kentucky.
It was a HUGE Unit, and that one unit probably would produce more electricty
than the eight units in the nearby Hydro Plant could.

Just thought I'd jump in and make a comment.

73 de Ed W9ODR        .                   .


... Have you checked your smoke detector batteries & Fire Ext, LATELY?!
--- MultiMail/MS-DOS v0.49
* Origin: capitolcityonline.net * Telnet/SSH:2022/HTTP (1:2320/105)

SOURCE: echomail via QWK@docsplace.org

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.