Jan. 23, 2009
George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller{at}nasa.gov
STATUS REPORT: ELV-012309
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: NOAA-N Prime
Launch Vehicle: Delta II 7320
Launch Pad: Space Launch Complex 2, Vandenberg Air Force Base, Calif.
Launch Date: Feb. 4, 2009
Launch Window: 2:22:01 - 2:32:01 a.m. PST
The Flight Program Verification, an integrated test of the Delta II
and NOAA-N Prime, was successfully completed Jan. 22. This is the
last major test before launch. Checkout of the spacecraft's
communications and telemetry systems is currently under way.
The payload fairing is scheduled to be installed around the
spacecraft
on Jan. 27. Loading of the Delta II second stage with hypergolic
propellants is scheduled to occur on Jan. 31.
There are no significant issues or concerns, and the launch remains
scheduled for Feb. 4.
Mission: Orbiting Carbon Observatory (OCO)
Launch Vehicle: Taurus XL (Orbital Sciences)
Launch Pad: Space Launch Complex 576-E, Vandenberg Air Force Base,
Calif.
Launch Date: Feb. 23, 2009
Launch Time: 1:51 a.m. PST (7 min., 30 sec. launch window)
In processing activities on the Taurus launch vehicle in Building
1555
on north Vandenberg, thermal blanket and avionics subsystem
installation is under way. Stage 1 is planned to be mated to Stage 2
between Jan. 24 and Jan. 26. Flight Simulation No. 2 is currently
planned for Jan. 27. Flight Simulation No. 3 is currently planned for
Feb. 11.
Stage 0, the stage providing the initial liftoff thrust, will be
hoisted into position at the launch pad on Jan. 30. The spacecraft
will be encapsulated into the payload fairing on Feb. 7. The
spacecraft is planned to be integrated with the Taurus third stage on
Feb. 3. Finally, the payload/upper launch vehicle integrated stack is
planned to be hoisted atop Stage 0 on Feb. 16.
Mission: Kepler
Launch Vehicle: Delta II 7925
Launch Pad: 17-B, Cape Canaveral Air Force Station, Fla.
Launch Date: March 5, 2009
Launch Time: 10:48:43 p.m. EDT
Testing of the Kepler spacecraft instruments is complete.
Compatibility tests with the Deep Space Network are under way. A
Kepler mission scenario test is scheduled for Jan. 24-25.
Launch preparations for the Delta II rocket continue on schedule at
Pad 17-B. Loading the first stage with liquid oxygen as a leak check,
as well as to serve as a countdown demonstration and certification
for the launch team, was successfully completed Jan. 19. A flight
simulation exercising the electrical and mechanical systems of the
rocket as they are to operate during the flight after liftoff was
successfully conducted the following day.
Routine testing to flight qualify the Delta II for the upcoming
launch
is continuing. The Kepler spacecraft is scheduled to arrive at Pad
17-B and be attached to the Delta II on Feb. 18.
Previous status reports are available at:
http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html
-end-
--- SBBSecho 2.12-Win32
* Origin: Derby City Gateway (1:2320/0)SEEN-BY: 10/1 3 34/999 120/228 123/500 128/2 140/1 222/2 226/0 249/303 250/306 SEEN-BY: 261/20 38 100 1381 1404 1406 1411 1418 266/1413 280/1027 320/119 SEEN-BY: 393/68 396/45 633/104 260 267 690/734 712/848 800/432 801/161 189 SEEN-BY: 2222/700 2320/100 105 200 2905/0 @PATH: 2320/0 100 261/38 633/260 267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.