subject: Expendable Launch Vehicle Status Report

Feb. 6, 2009

George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller{at}nasa.gov

STATUS REPORT: ELV-020609

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Mission: NOAA-N Prime
Launch Vehicle: Delta II 7320
Launch Pad: Space Launch Complex 2, Vandenberg Air Force Base, Calif.
Launch Date: Feb. 6, 2009
Launch Time: 2:22 a.m. PST

The United Launch Alliance Delta II rocket carrying the NOAA-N Prime
weather satellite launched at 2:22 a.m. PST after two consecutive
days of launch scrubs. The satellite successfully separated from the
rocket's second stage 65 minutes after launch. NOAA-N Prime now is in
its circular polar orbit about 534 miles, or 464 nautical miles,
above Earth.



Mission: Orbiting Carbon Observatory (OCO)
Launch Vehicle: Taurus XL (Orbital Sciences)
Launch Pad: Space Launch Complex 576-E, Vandenberg Air Force Base,
Calif.
Launch Date: Feb. 23, 2009
Launch Time: 1:51 a.m. PST (7 min., 30 sec. launch window)

The OCO spacecraft is being mated to the payload attach fitting
Friday. Encapsulating the spacecraft into the fairing halves begins
this weekend with the first half on Feb. 7 and the second half on
Feb. 9. OCO will then go to the launch pad on Feb. 10.

The upper launch vehicle stack, consisting of Taurus stages 1, 2 and
3, was transported to the launch pad on Feb. 3, joining Stage 0.
Technicians plan to integrate the encapsulated OCO spacecraft with
the Taurus third stage on Feb. 13. Finally, the payload/upper launch
vehicle integrated stack is set to be hoisted atop Stage 0 on Feb.
16.

Taurus Flight Simulation No. 3 currently is planned for Feb. 11.



Mission: Kepler
Launch Vehicle: Delta II 7925
Launch Pad: 17-B, Cape Canaveral Air Force Station, Fla.
Launch Date: March 5, 2009
Launch Time: 10:48:43 p.m. EDT

Spacecraft fueling operations are set for this weekend. Attaching
Kepler to the upper stage booster is scheduled for Feb. 16.
Installing the integrated stack into the transportation canister and
placing it on the payload transporter are scheduled for the following
day. Kepler will be moved to Launch Complex 17 on Feb. 19 to be mated
to the Delta II rocket on Pad 17-B.

Previous status reports are available at:

http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html

-end-
--- SBBSecho 2.12-Win32
* Origin: Derby City Gateway (1:2320/0)
SEEN-BY: 10/1 3 34/999 120/228 123/500 128/2 140/1 222/2 226/0 249/303 250/306
SEEN-BY: 261/20 38 100 1381 1404 1406 1411 1418 266/1413 280/1027 320/119
SEEN-BY: 393/68 396/45 633/104 260 267 690/734 712/848 800/432 801/161 189
SEEN-BY: 2222/700 2320/100 105 200 2905/0
@PATH: 2320/0 100 261/38 633/260 267

SOURCE: echomail via fidonet.ozzmosis.com

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.