| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 2\25 Pt-2 ISS On Orbit Status 25-02-2003 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 2\25 ISS On-Orbit Status 25-02-2003 Part 2 of 2 Today's targets for the CEO (crew earth observations program) were Yellow River Delta (while smog may have been present, the crew otherwise had an excellent view this pass of this active delta system under winter, low discharge conditions. Looking left of track towards the coast to the northeast), Ganges River Delta (fine weather and good lighting conditions combined with a pass over the western corner of this target area to offer good views of this large complex delta system. Looking left of track for oblique views), Singapore (although the city may not have been visible this pass, the crew was to look right of track towards the big island of Sumatra where this year's fire season has gotten an early start, trying to spot smoke plumes and point sources), Eastern Mediterranean Smog (this descending pass offered multiple opportunities to document smog over the Po Valley, the Adriatic basin, the Balkan Peninsula, and the Aegean Sea. Trying for oblique and limb views to the left of track), and Western Mediterranean Dust (looking left of track along the Algerian and Tunisian coast for northward moving dust plumes). CEO images can be viewed at the website http://eol.jsc.nasa.gov U.S. and Russian Segment Status (as of 1:45pm EST). Environmental Control and Life Support (ECLSS) and Thermal Control (TCS): Elektron O2 generator is powered On (24 Amp mode). Vozdukh CO2 scrubber is On (Manual mode 5). U.S. CDRA CO2 scrubber is Off. TCCS (trace contaminant control subsystem) is operating. MCA (major constituents analyzer) is operating. BMP Harmful Impurities unit: Absorbent bed #1 in Purify mode, bed #2 in Purify mode. RS air conditioner SKV-1 is On; SKV-2 is Off. SM Working Compartment: Pressure (mmHg) -- 753; temperature (deg C) -- 26.9; ppO2 (mmHg) -- 183.1; ppCO2 (mmHg) -- 2.2 (suspect). SM Transfer Compartment: Pressure (mmHg) -- 751; temperature (deg C) -- 20.5. FGB Cabin: Pressure (mmHg) -- 752; temperature (deg C) -- 21.0. Node: Pressure (mmHg) -- 743.25; temperature (deg C) -- 24.3 (shell); ppO2 (mmHg) -- 167.3; ppCO2 (mmHg) -- 4.0. U.S. Lab: Pressure (mmHg) -- 745.22; temperature (deg C) -- 21.8; ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a; Joint Airlock (Equip. Lock): Pressure (mmHg) -- 745.32; temperature (deg C) -- 22.1; shell heater temp (deg C) -- 24.1, ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a. PMA-1: Shell heater temp (deg C) -- 24.5 PMA-2: Shell heater temp (deg C) -- 12.2 (n/a = data not available) (* = sample location currently unavailable until completion of R3 s/w upload on 2/20) Propulsion System (PS): Total propellant load available [SM(811) + FGB(2777) + Progress(576)] -- 4164 kg (9180 lb) as of 2/14/03. (Capability: SM -- 860 kg; FGB -- 6120 kg). Electrical Power Systems (EPS): Both P6 channels fully operational. Beta Gimbal Assembly (BGA) 2B and 4B both in auto track (sun following) mode. SM batteries: Battery #4 is in "Cycle" mode (freshly installed); all other batteries (7) are in "Partial Charge" mode. FGB batteries: Battery #1 is off line (replaced today); all other batteries (5) are in "Partial Charge" mode. Plasma Contactor Unit PCU-1 and PCU-2 both in Standby mode. Command & Data Handling Systems: C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby. GNC-2 MDM is prime; GNC-1 is Backup. INT-1 is operating; INT-2 is Off. EXT-1 is On (primary), EXT-2 is Off. LA-1, LA-2 and LA-3 MDMs are all operating. PL-2 MDM is On (primary); PL-1 MDM is Off APS-1 (automated payload switch #1) and APS-2 are both On. SM Terminal Computer (TVM): 2 redundant lanes (of 3) operational. Lane 1 is out of the set (as of 11/14/02). SM Central Computer (TsVM): 3 redundant lanes (of 3) operational. Attitude Source: 3 CMGs on-line (CMG-1 failed). State vector -- U.S. SIGI-1 (GPS) Attitude -- U.S. SIGI-1 (GPS) Angular rates -- U.S. RGA-1 Flight Attitude: XPOP (x-axis perpendicular to orbit plane = "sun-fixed" [yaw: 0 deg, pitch: -8.8 deg., roll: 0 deg]), with CMG/Thruster Assist Momentum Management). Solar Beta Angle: -51.8 deg (magnitude decreasing). Communications & Tracking Systems: FGB MDM-1 is powered Off; FGB MDM-2 is operational. All other Russian communications & tracking systems are nominal. S-band is operating nominally. Ku-band is operating nominally. Audio subsystem operating nominally. Video subsystem operating nominally (VTR1 is operable again). HCOR (high-rate communications outage recorder) is operating nominally. Robotics: SSRMS/Canadarm2 based at MBS PDGF2 with Keep Alive (KA) power on both strings. MBS: KA power on both strings. MT: latched at WS4, with KA power. POA: KA power on both strings. RWS (robotics workstations): Lab RWS is Off; Cupola RWS is Off. ISS Orbit (as of this morning, 7:17am EST [= epoch]): Mean altitude -- 391.2 km Apogee -- 399.4 km Perigee -- 383.0 km Period -- 92.38 min. Inclination (to Equator) -- 51.63 deg Eccentricity -- 0.0012122 Orbits per 24-hr. day -- 15.59 Mean altitude loss in last 24 hours -- 70 m Solar Beta Angle -- -51.8 deg (magnitude decreasing) Revolutions since FGB/Zarya launch (Nov. '98) -- 24358 For more on ISS orbit and worldwide naked-eye visibility dates/times, see http://www.hq.nasa.gov/osf/station/viewing/issvis.html - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.