TIP: Click on subject to list as thread! ANSI
echo: sb-nasa_news
to: All
from: Dan Dubrick
date: 2003-05-16 22:06:00
subject: 5\07 Pt 2 ISS On-Orbit Status 07-05-2003

This Echo is READ ONLY !   NO Un-Authorized Messages Please!
 ~~~~~~~~~~~~~~~~~~~~~~~~   ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

07 May 2003

ISS On-Orbit Status 7 May 2003

Part 2 of 2

Propulsion System (PS):

Total propellant load available: 3607 kg (7952 lb) as of 5/1
[SM(774) + FGB(2581) + Progress(252)].  (Capability: SM -- 860 kg;
FGB -- 6120 kg). 

Electrical Power Systems (EPS):

Both P6 channels fully operational.  BGA (beta gimbal assembly) 2B
and 4B both in directed position (Blind mode, non solar-tracking,
drag reduction). 

SM batteries: (Data static)  Battery #4 is disconnected, in
stand-alone ops; all other batteries (7) are in "Partial Charge"
mode.
FGB batteries:  Battery #5 is disconnected; all other batteries (5)
are in "Partial Charge" mode.
Plasma Contactor Unit PCU-1 and PCU-2 both in Standby mode.

Command & Data Handling Systems:

C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby.
GNC-1 MDM is prime; GNC-2 is Backup.
INT-1 is operating; INT-2 is Off.
EXT-2 is On (primary), EXT-1 is Off (both now upgraded to R3).
LA-1, LA-2 and LA-3 MDMs are all operating.
PL-2 MDM is On (primary); PL-1 MDM is Off
APS-1 (automated payload switch #1) and APS-2 are both On.
SM Terminal Computer (TVM): 3 redundant lanes (of 3) operational.
Being upgraded.
SM Central Computer (TsVM): 3 redundant lanes (of 3) operational.
Being upgraded.

Attitude Control Systems:

3 CMGs on-line (CMG-1 failed).
State vector source -- U.S. SIGI-1 (GPS)
Attitude source -- U.S. SIGI-1 (GPS)
Angular rate source -- RGA-2

Flight Attitude:

LVLH (local vertical/local horizontal = "earth-fixed": z-axis in
local vertical, x-axis in velocity vector [yaw: -10 deg, pitch: -7.2
deg, roll: 0 deg]), with CMG/TA (thruster assist) Momentum
Management.
Solar Beta angle: 10.0 deg (magnitude increasing).

Communications & Tracking Systems:

FGB MDM-1 is powered Off; FGB MDM-2 is operational.
All other Russian communications & tracking systems are nominal.
S-band is operating nominally.
Ku-band is operating nominally.
Audio subsystem operating nominally.
Video subsystem operating nominally (VTR1 is operable again; VTR2 in
troubleshooting).
HCOR (high-rate communications outage recorder) is operating
nominally.

Robotics:

SSRMS/Canadarm2 based at MBS PDGF #1 with Keep Alive (KA) power on
both strings.
MBS: KA power on both strings.
MT: latched at WS4, with KA power.
POA: KA power on both strings.
RWS (robotics workstations): Lab RWS is Off; Cupola RWS is Off.

ISS Orbit  (as of this morning, 6:48am EDT [= epoch]):

Mean altitude -- 390.4 km
Apogee -- 394.9 km
Perigee -- 385.9 km
Period -- 92.36 min.
Inclination (to Equator) --  51.63 deg
Eccentricity -- 0.0006636
Orbits per 24-hr. day -- 15.59
Solar Beta Angle:  10.0 deg (magnitude increasing)
Mean altitude loss in last 24 hours -- 175 m
Revolutions since FGB/Zarya launch (Nov. '98)  -- 25449
For more on ISS orbit and worldwide naked-eye visibility dates/times,
see http://www.hq.nasa.gov/osf/station/viewing/issvis.html

 - END OF FILE -
==========

@Message posted automagically by IMTHINGS POST 1.30
--- 
* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1)
SEEN-BY: 633/267 270
@PATH: 153/719 715 7715 140/1 106/2000 633/267

SOURCE: echomail via fidonet.ozzmosis.com

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.