JIM WELLER (1:123/140) wrote to STEVEN HORN at 00:48 on 01 Apr 2006:
JW> We won't see that in our lifetime. We've been waiting for the road
JW> from Alberta to be paved since 1967. There are still 40 miles
JW> unfinished. And we have been waiting for a road around the east
JW> side of Great Slave lake to Fort McMurray since Diefenbacker was
JW> Prime Minister!
I would agree with you that the Bathurst Inlet road may be a bit of a pipe
dream although one might think that increased mining activity might have an
impact on that. As for paving the road from High Level, I note that it was
still unpaved in 1988 and is now down to the 40 miles just west of
Yellowknife and I thought that this stretch was to be dealt with this year.
I don't think I'd ever heard of the road to Fort McMurray but could that be
tied into the gas pipeline?
Take care,
Steven Horn (steven.horn{at}gmail.com)
Moderator, ALASKA_CHAT
--- timEd/386 1.10.y2k+
* Origin: North of 60 in Whitehorse, Yukon, Canada (1:17/67)SEEN-BY: 633/267 270 @PATH: 17/67 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.