| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 3\03 Pt-2 ISS On Orbit Status 03-03-2003 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 3\03 ISS On-Orbit Status 03-03-2003 Part 2 of 2 Progress thruster test burns/reboosts are scheduled for next week. Manifold 1: 3/11; manifold 2: 3/13. Delta-V ~1m/sec each. Today's targets for the CEO (crew earth observations program) were Ganges River Delta (good viewing conditions should have continued at this time of the crew's pass west of this complex delta target. They were to use the long lenses to document subtle details of the vegetation and land use patterns, especially near the coast), Nairobi, Kenya (the Kenyan capital was too far off nadir for useful views this pass. However, just a few seconds SE, to the left of track, the crew was to try once more for details of the small ice fields and glaciers atop Mount Kilimanjaro), and Eastern Mediterranean Smog (weather was "iffy" this pass, but the crew may have been able to document heavy smog over the Aegean Sea and eastern Turkey. As the ISS tracked over Greece, they were to look obliquely left of track towards the NE to detect smog from a number of source regions). CEO images can be viewed at the website: http://eol.jsc.nasa.gov U.S. and Russian Segment Status (as of 1:45pm EST). Environmental Control and Life Support (ECLSS) and Thermal Control (TCS): Elektron O2 generator is powered On (32 Amp mode). Vozdukh CO2 scrubber is On (Manual mode 5). U.S. CDRA CO2 scrubber is Off. TCCS (trace contaminant control subsystem) is operating. MCA (major constituents analyzer) is operating. BMP Harmful Impurities unit: Absorbent bed #1 in Regeneration mode, bed #2 in Purify mode. RS air conditioner SKV-1 is On; SKV-2 is Off. SM Working Compartment: Pressure (mmHg) -- 753; temperature (deg C) -- 27.6; ppO2 (mmHg) -- 174.5; ppCO2 (mmHg) -- 2.2 (suspect). SM Transfer Compartment: Pressure (mmHg) -- 751; temperature (deg C) -- 21.1. FGB Cabin: Pressure (mmHg) -- 752; temperature (deg C) -- 22.7. Node: Pressure (mmHg) -- 741.34; temperature (deg C) -- 24.0 (shell); ppO2 (mmHg) -- 166.5; ppCO2 (mmHg) -- 3.9. U.S. Lab: Pressure (mmHg) -- 743.30; temperature (deg C) -- 22.2; ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a; Joint Airlock (Equip. Lock): Pressure (mmHg) -- 743.40; temperature (deg C) -- 21.0; shell heater temp (deg C) -- 21.7, ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a. PMA-1: Shell heater temp (deg C) -- 25.8 PMA-2: Shell heater temp (deg C) -- 14.0 (n/a = data not available) Propulsion System (PS): Total propellant load available [SM(820) + FGB(2753) + Progress(576)] -- 4149 kg (9147 lb) as of 2/27/03. (Capability: SM -- 860 kg; FGB -- 6120 kg). Electrical Power Systems (EPS): Both P6 channels fully operational. Beta Gimbal Assembly (BGA) 2B and 4B both in auto track (sun following) mode. SM batteries: All batteries (8) are in "Partial Charge" mode. FGB batteries: All batteries (6) are in "Partial Charge" mode. Plasma Contactor Unit PCU-1 and PCU-2 both in Standby mode. Command & Data Handling Systems: C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby. GNC-1 MDM is prime; GNC-2 is Backup. INT-1 is operating; INT-2 is Off. EXT-1 is On (primary), EXT-2 is Off. LA-1, LA-2 and LA-3 MDMs are all operating. PL-2 MDM is On (primary); PL-1 MDM is Off APS-1 (automated payload switch #1) and APS-2 are both On. SM Terminal Computer (TVM): 2 redundant lanes (of 3) operational. Lane 1 is out of the set (as of 11/14/02). SM Central Computer (TsVM): 2 redundant lanes (of 3) operational. Lane 1 is out of the set (as of 3/2/03). Attitude Control Systems: 3 CMGs on-line (CMG-1 failed). State vector source -- Russian Attitude source -- Russian Angular rate source -- Russian. Flight Attitude: XPOP (x-axis perpendicular to orbit plane = "sun-fixed" [yaw: 0 deg, pitch: -8.8 deg., roll: 0 deg]), with CMG/Thruster Assist Momentum Management). Solar Beta Angle: -25.1 deg (magnitude decreasing). Communications & Tracking Systems: FGB MDM-1 is powered Off; FGB MDM-2 is operational. All other Russian communications & tracking systems are nominal. S-band is operating nominally. Ku-band is operating nominally. Audio subsystem operating nominally. Video subsystem operating nominally (VTR1 is operable again). HCOR (high-rate communications outage recorder) is operating nominally. Robotics: SSRMS/Canadarm2 based at MBS PDGF2 with Keep Alive (KA) power on both strings. MBS: KA power on both strings. MT: latched at WS4, with KA power. POA: KA power on both strings. RWS (robotics workstations): Lab RWS is Off; Cupola RWS is Off. ISS Orbit (as of this morning, 7:05am EST [= epoch]): Mean altitude -- 391.0 km Apogee -- 399.2 km Perigee -- 382.8 km Period -- 92.38 min. Inclination (to Equator) -- 51.63 deg Eccentricity -- 0.0012128 Orbits per 24-hr. day -- 15.59 Mean altitude loss in last 24 hours -- 130m Solar Beta Angle -- -25.1 deg (magnitude decreasing) Revolutions since FGB/Zarya launch (Nov. '98) -- 24389 For more on ISS orbit and worldwide naked-eye visibility dates/times, see http://www.hq.nasa.gov/osf/station/viewing/issvis.html - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.