| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 3\24 Pt 2 ISS On-Orbit Status 24-03-2003 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 25 Mar 2003 FOR OFFICIAL USE ONLY ISS On-Orbit Status 3/24/03 Part 2 of 2 Today's targets for the CEO (crew earth observations) program (with illumination is now, on Vernal Equinox, rapidly shifting from the Southern to the Northern Hemisphere, and light soon too low for southernmost targets like lower Patagonia) were Lake Eyre, Australia (the CEO ground team has no recent images of this target area in this El Nino cycle. Looking left of track for views of as much of the lake's mostly dry basin as possible), and Industrialized Southeastern Africa (the ISS pass offered fine oblique views of the South Africa's industrial corridor to the right of track. The crew was to document the position and extent of smog palls there). CEO images can be viewed at the websites http://eol.jsc.nasa.gov and http://earthobservatory.nasa.gov U.S. and Russian Segment Status (as of 1:18pm EST). Environmental Control and Life Support (ECLSS) and Thermal Control (TCS):Elektron O2 generator is powered On (24 Amp). Vozdukh CO2 scrubber is On (manual mode 5). U.S. CDRA CO2 scrubber is Off. TCCS (trace contaminant control subsystem) is operating. MCA (major constituents analyzer) is operating. BMP Harmful Impurities unit: Absorbent bed #1 in Purify mode, bed #2 in Purify mode. RS air conditioner SKV-1 is On; SKV-2 is Off. Propulsion System (PS): Total propellant load available [SM(774) + FGB(2746) + Progress(474] --- 3994 kg (8805 lb) as of 3/20/03. (Capability: SM -- 860 kg; FGB -- 6120 kg). Electrical Power Systems (EPS): Both P6 channels fully operational. BGA (beta gimbal assembly) 2B and 4B both in Directed Position (278 deg & 82 deg) to minimize aerodynamic drag. SM batteries: Battery #7 is in "Cycle" mode; all other batteries (7) are in "Partial Charge" mode. FGB batteries: Battery #2 is off line; all other batteries (5) are in "Partial Charge" mode. Plasma Contactor Unit PCU-1 and PCU-2 both in Standby mode. Command & Data Handling Systems: C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby. GNC-2 MDM is prime; GNC-1 is Backup. INT-1 is operating; INT-2 is Off. EXT-1 is On (primary), EXT-2 is Off. LA-1, LA-2 and LA-3 MDMs are all operating. PL-2 MDM is On (primary); PL-1 MDM is Off APS-1 (automated payload switch #1) and APS-2 are both On. SM Terminal Computer (TVM): 3 redundant lanes (of 3) operational. Being upgraded. SM Central Computer (TsVM): 3 redundant lanes (of 3) operational. Being upgraded. Attitude Control Systems: 3 CMGs on-line (CMG-1 failed). State vector source -- U.S. SIGI-1 (GPS) Attitude source -- U.S. SIGI-1 (GPS) Angular rate source -- RGA-2 Flight Attitude: XPOP (x-axis perpendicular to orbit plane = "sun-fixed" [yaw: -179.0 deg, pitch: -8.8 deg., roll: 0 deg]), with CMG TA (thruster assist) Momentum Management. Solar Beta Angle: 68.0 deg (magnitude increasing). Communications & Tracking Systems: FGB MDM-1 is powered Off; FGB MDM-2 is operational. All other Russian communications & tracking systems are nominal. S-band is operating nominally. Ku-band is operating nominally. Audio subsystem operating nominally. Video subsystem operating nominally (VTR1 is operable again). HCOR (high-rate communications outage recorder) is operating nominally. Robotics: SSRMS/Canadarm2 based at Lab PDGF with Keep Alive (KA) power on both strings. MBS: KA power on both strings. MT: latched at WS4, with KA power. POA: KA power on both strings. RWS (robotics workstations): Lab RWS is Off; Cupola RWS is Off. ISS Orbit (as of this morning, 7:06am EST [= epoch]): Mean altitude -- 390.2 km Apogee -- 395.8 km Perigee -- 384.6 km Period -- 92.36 min. Inclination (to Equator) -- 51.63 deg Eccentricity -- 0.0008261 Orbits per 24-hr. day -- 15.59 Solar Beta Angle: 68.0 deg (magnitude increasing) Mean altitude loss in last 24 hours -- 100 m Revolutions since FGB/Zarya launch (Nov. '98) -- 24779 For more on ISS orbit and worldwide naked-eye visibility dates/times, see http://www.hq.nasa.gov/osf/station/viewing/issvis.html - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.