> Didn't he answer that above? You are asking for a HUGE AE system when
> you require that amount of power, and it costs a LOT of money. And you
> really shouldn't be so belligerent about folks telling you about the
> need for more information before attempting to size a system. That's the
> only way it can be done.
Belligerent, not quite, frusteration was the problem. Tell me something. If
one hires an expert to "size" the system, what does he do? Add everything up
and get a total, right? So I gave them the total, saved them the trouble of
adding the loads.
Like I said, I did find a couple of engineers that are capable of thinking
beyond beyond two or three light bulbs and a 5" TV per housing or business
unit. A couple of messages back and forth, its all done. In this way I have
also put together the bid list for later in the spring when it is time.
TTYL
James