3\06 HST Daily Rpt No 3314
Part 3 of 3
FLIGHT OPERATIONS SUMMARY:
Significant Spacecraft Anomalies: (The following are preliminary
reports of potential non-nominal performance that will be
investigated.)
HSTAR 8948: STIS Tungsten Lamp Failed to Turn On. On day 03/061
(03/02/03) at 19:57:06 UT, a target acquisition image was
taken with STIS's CCD. The third sub-exposure of that
image, that is a through-slit exposure of 0.1 sec in
length with the Tungsten lamp ON, did not show any flux
(other than background noise). Under investigation.
HSTAR 8950: GSacq(1,2,1) results to Finelock Backup (2,0,2). The
GSACQ(1,2,1) of 066/06:32:55 - 06:40:17 which begun
during ZOE, resulted to Finelock Backup, at AOS
066/06:49:04 using FGS#2 (2,0,2) due to SCANSTEP LMT EXC
on FGS#1.Possible observations affected:STIS 87,88 WFPCII
150 thru 160. The guide star acquisition for this
observation was non-nominal, further analysis will
determine if a repeat observation is required.
COMPLETED OPS REQs: NONE
OPS NOTES EXECUTED: NONE
SCHEDULED SUCCESSFUL FAILURE TIMES
FGS GSacq 11 11
FGS REacq 05 05
FHST Update 18 18
LOSS of LOCK
SIGNIFICANT EVENTS: None
- End of File -
================
---
* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719)SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.