MIRNEWS.381 3 SEPTEMBER 1997
Power supply: Vinogradov worked hard on the deployment of cables from the
Spektr hatch to other modules and gradually he succeeded in restoring a part
of the power supply for the modules Kvant-2 and Kristall. The 3 undamaged
solar pane ls of Spektr delivered power, but rotation to achieve maximum
solar illumination is not yet possible.
Solovyov struggled along to keep Elektron in Kvant-1 operational and he also
used power for the restoration of the Ele ktron in Kvant-2. On 25.08
Elektron in Kvant-1 shut itself off and the TGK (the solid fuel oxygen
generator) did not w ork due to a defective firing pin. Before the outbreak
of the usual press panic the cosmonauts had already repaired the
TGK and Elektron in Kvant-1.
The power supply is partly restored in Kvant-2 and Kristall: the lights are
burning, the heating functions again and t he drying process is going on.
EVA preparations: Solovyov and Foale were convinced that they would get
green light for the EVA on 6.09 and they start ed the preparations. Several
times they donned their Orlan-M suits, checked all systems and took a stock
of all the e quipment needed for the EVA. Foale saw a film of his EVA
training with Budarin in TsPK. He and S. also reviewed the s o called
'cyclogram' of the EVA. The training of Foale during which Solovyov was
instructor served also as a test to de termine whether Foale will be able to
do the EVA or not.
Communications: The Altair-2 is regularly in use for communications between
MIR and TsUP. They use this satellite for
phone as well as for TV. On 1, 2 and 3.09 they showed images of their
training, also with their space suits on, but also now and then video films
of the interior and the outersurface of the complex.
If on 4.09.1997 a positive decision will be taken the EVA will be made on
6.09.97. Opening of the hatch: 0055UTC; plan ned duration 5 hrs 40 mins.
Chris Vandenberg, NL-9165/A-UK3202
--- Maximus 2.01
---------------
* Origin: Scoop BBS (The Netherlands) +31-33-2996366 (2:500/202)
|