| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 12\09 Ariane-5 Flt-157 update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Flight 157 December 9: Go-ahead for the Wednesday evening liftoff ====================================================== Arianespace's first "10-ton" Ariane 5 is set for liftoff Wednesday evening following the launch readiness review held today at the Spaceport. The review confirmed the launch infrastructure was ready for launch, including Ariane 5's launch table - which had its chill-down igniters replaced following the Nov. 28 countdown interruption. Rollout of the Ariane 5 from its final assembly building to the launch zone will occur tomorrow, with filling of the cryogenic core stage and the new cryogenic upper stage to begin Wednesday morning. Flight 157 will carry the HOT BIRDTM 7 TV broadcast satellite for Eutelsat, along with the French CNES space agency's STENTOR telecom technology demonstrator. HOT BIRDTM 7 is installed in the upper payload position and will be released first by the Ariane 5 during the 49-minute-long mission, followed by STENTOR The increased-lift Ariane 5 has a 10-metric ton payload capacity to geostationary transfer orbit. This performance consolidates Arianespace's competitive position by providing the capability to pair up almost any combination of telecommunications satellites for efficient dual launches. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.