| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 11\21 Japan - H-IIA- F4- Daily Rpt |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ NADSA, Japan Payload Launch Site Operations are Underway at SFA -- 22 days before a launch -- On Nov. 21, in the Spacecraft and Fairing Assembly Building (SFA), three microsatellites, Australian FedSat, Whale Ecology Observation Satellite (WEOS) of Chiba Institute of Technology, and µ-LabSat of NASDA, were mated with the piggyback launch payload support structure. FedSat and WEOS have been under preparation and mating operations in the previous days. µ-LabSat is a "hand-made" microsatellite developed and manufactured by NASDA. Payload fairing Also in SFA, a payload fairing that protects the payloads from vibration of liftoff and friction in the atmosphere is also under preparation. Since its arrival at the Tanegashima Space Center on Nov. 8, the fairing went through visual inspection and pyrotechnic circuit checking. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.