| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 12\03 Ariane Flt 158 - Rosetta Update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Rosetta Mission Update Arianespace Flight 158 December 3: Combined operations begin for the Rosetta launch Preparations for Arianespace Flight 158 marked another milestone today as the comet-chasing Rosetta spacecraft made its first contact with Ariane 5 launcher hardware. The activity took place in Arianespace's new S5 satellite preparation facility, where Rosetta was mated to the Ariane 5's adapter cone. The photos below show Rosetta during its first "meeting" with the Ariane 5 (click on the images for larger versions): [Image] The European Space Agency's Rosetta spacecraft is carefully lowered onto the conic-shaped interface adapter cone. The combination will be integrated atop the Ariane 5 in the final pre-launch preparations. Flight 158 is scheduled for liftoff from the Spaceport January 12 on a complex deep-space trajectory to catch the Comet Wirtanen on a mission lasting through 2013. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.