MIRNEWS.360 12 JUNE 1997
Progress-M35: This freighter is on schedule for late this month. If launch
and flight will go as planned Progress-M34
will have to leave the aft docking port (+X-axis) the day before the arrival
of Pr-M35. Apart from the normal cargo a badly needed component for the
Antares-transmitter on board MIR has to be delivered by Pr -M35. Until the
restoration of MIR's satellite relay system audio and video downlinks will
be limited to groundstatio n passes.
Progress-M34: It might be possible that before the departure for decay in
the Earth's atmosphere the Russians will exe cute an autonomous flight with
the old freighter to test the TORU system. Thusfar no confirmation about
this operati on.
Radio-amateurisme: The fact that the MIR-crew is active again on the
radio-amateur-frequencies confirms that the situa tion on board though not
fully back to normal , improved to such a degree that they got more time to
relax. During al most every pass within our range the amateur station in the
145 mc band is active, mostly in Packet Radio, but also in Phone. Mike Foale
(call KB5UAC) or the Russians (R0MIR) can be heard on MIR's downlink 145.800
mc. (uplink 145.200 mc) . The crew transmitted a P/R message in which they
said that they planned to increase P/R traffic. In another P/R me ssage
they reported that the Safex-2 transponder in the Priroda Module is
operational again. Downlink is 437.950 mc, u plink 435.750 mc. To open the
transponder a CTCSS tone of 141.3 herz is needed. During docking operations
with Soyuz-T M- and Progress-M ships and Shuttles Safex-2 will be OFF to
avoid interferences on crucial systems.
Chris v.d. Berg, NL-9165/A-UK3202
--- Maximus 2.01
---------------
* Origin: Scoop BBS (The Netherlands) +31-33-2996366 (2:500/202)
|