| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 12\11 Ariane-5 Flt-157 update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ December 11 launch day update: The final countdown begins for Arianespace's "10-ton" Ariane 5 The final countdown is underway for Arianespace's first mission with its increased-lift "10-ton" Ariane 5. Activity began in the morning hours as Ariane 5 and the Spaceport were configured for this evening's liftoff. Fueling of the launcher's cryogenic central stage and upper stage will follow, after the launch zone is evacuated. The 53-minute launch window opens at 7:21 p.m. Flight 157 will carry two satellite payloads, demonstrating the Ariane 5's capability to pair up all types of spacecraft for efficient dual launches. The first satellite to be deployed is the Eutelsat HOT BIRDTM 7 TV broadcast platform, followed minutes later by the French CNES space agency's STENTOR telecom demonstrator spacecraft. The Ariane 5 used for today's mission is the first launcher with a 10-ton payload lift capacity to geostationary transfer orbit (GTO) -- increased performance that will further improve Arianespace's competitiveness. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.