| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 10\22 Ariane-5 Flight 157 update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Flight 157 October 22: The "10 ton" Ariane 5 gets ready for its dual satellite payload Arianespace's first increased-lift "10 ton" Ariane 5 is back in the final assembly building following last week's full dress rehearsal, which included a test firing of the Vulcain main engine. Last week's "launch system rehearsal" included the simultaneous filling of the EPC and ESC-A cryogenic stages, followed by simulated countdowns that concluded with the Vulcain's planned ignition and operation for 14 seconds The Ariane 5 was then rolled back to the Spaceport's final assembly building while data from the rehearsal is processed. Liftoff of Flight 157 is scheduled from November 20 carrying the dual payload of Eutelsat's HOT BIRDTM 7 and the Stentor telecommunications demonstrator spacecraft for the French CNES space agency. Flight 157 will be Arianespace's 11th launch of 2002. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.