TIP: Click on subject to list as thread! ANSI
echo: sb-world_nws
to: All
from: Hugh S. Gregory
date: 1996-01-01 00:30:34
subject: 10\22 Ariane-5 Flight 157 update

This Echo is READ ONLY !   NO Un-Authorized Messages Please!
 ~~~~~~~~~~~~~~~~~~~~~~~~   ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Flight 157
October 22: The "10 ton" Ariane 5 gets 
ready for its dual satellite payload

Arianespace's first increased-lift "10 ton" Ariane 5 is back in the 
final assembly building following last week's full dress rehearsal, 
which included a test firing of the Vulcain main engine.

Last week's "launch system rehearsal" included the simultaneous 
filling of the EPC and ESC-A cryogenic stages, followed by simulated 
countdowns that concluded with the Vulcain's planned ignition and 
operation for 14 seconds

The Ariane 5 was then rolled back to the Spaceport's final assembly 
building while data from the rehearsal is processed.

Liftoff of Flight 157 is scheduled from November 20 carrying the dual
payload of Eutelsat's HOT BIRDTM 7 and the Stentor telecommunications
demonstrator spacecraft for the French CNES space agency.

Flight 157 will be Arianespace's 11th launch of 2002.

 - End of File -
================

---
* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719)
SEEN-BY: 633/267 270
@PATH: 153/719 715 7715 140/1 106/2000 1 379/1 633/267

SOURCE: echomail via fidonet.ozzmosis.com

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.