| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | Re: ATM pier leveling. |
To: atm{at}shore.net
From: Andy Saulietis
Reply-To: Andy Saulietis
Larry L writes,
>We have a brand new metal pier and we are trying to mate it with
>an existing concrete pier.
>
>We were intending on using sheet lead but as of right now
>we have too much gap.
>
>We may discover the problem or we may need to use another
>method.
>
>Does anyone have any experience mating the mounting surface
>of a metal pier with the mostly even surface of an existing
>concrete pier ?
Etch the concrete with muriatic (swimming pool) acid. Hose off acid after
it stops fizzing, don't get this stuff on your clothes..:)
Get a 5 lb box of grouting compound (at hardware stores), mix according to
directions, trowel a layer thick enough to bridge the gaps between the
concrete & pier,
place a plastic sheet on the grout, & lower the pier onto the
plastic/grout, jiggle it to ensure full even contact. Go have a drink until
the stuff dries (read box for time). The quick-set grout takes <30 min.
Andy Saulietis
ISS Enterprises
PO Box 19
Mayhill NM 88339
World's first astronomy land development:
http://www.pvtnetworks.net/~iss/starend1.htm
505-687-3067 voice/fax, call voice or e-mail to set up e-mail: iss{at}pvtnetworks.net
--- BBBS/NT v4.01 Flag-5
* Origin: Email Gate (1:379/100)SEEN-BY: 633/267 270 @PATH: 379/100 1 106/1 2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.