| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 1\24 Ariane-5 Flt -no number yet- update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ January 24: Another Ariane 5 is prepared for liftoff ==================================================== The Ariane 5 for Arianespace's next heavy-lift mission is being assembled at the Spaceport in French Guiana. The Ariane 5's large cryogenic core stage is raised to the vertical position inside the integration building, readying it for positioning over the mobile launch table. This core stage will then be mated with the launcher's two solid rocket stages. One of two solid rocket stages for the Ariane 5 is transferred for its mating with the vehicle's core cryogenic stage. The solid rocket stage is installed on a pallet, which slides onto Ariane 5's large mobile launch table for integration. - End of File - ================ ---* Origin: SpaceBase[tm] Vancouver Canada [3 Lines] 604-473-9357 (1:153/719) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.