| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 5\01 HST Daily Rpt No 3353 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please!
~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
01 May 2003
Subject: Daily 3353
HUBBLE SPACE TELESCOPE
DAILY REPORT # 3353
PERIOD COVERED: DOY 120
OBSERVATIONS SCHEDULED
No science proposals executed on DOY 120 due to safemode entry.
Science intercept Science Mission Specification to start
2003.121:00:00:00z. Associated scheduled proposals to be reported in
tomorrow's daily report.
FLIGHT OPERATIONS SUMMARY:
Significant Spacecraft Anomalies: (The following are preliminary
reports of potential non-nominal performance that will be
investigated.) None
COMPLETED OPS REQs:
16961-0 LBBIAS Uplink {at} 120/13:09:35z
16963-0 Updating PSEA RGA Biases {at} 14:02:41z
16964-0 ARU/PRT {at} 120/14:41:02z
16965-0 LBBIAS Uplink {at} 120/18:20z
16966-0 ARU/PRT {at} 120/2135Z
16967-0 LBBIAS Uplink {at} 120/22:07z
16968-0 R/T MAP {at} 120/22:33z
16969-1 R/T MAP
OPS NOTES EXECUTED:NONE
SCHEDULED SUCCESSFUL FAILURE TIMES
FGS GSacq 1 1
FGS REacq 3 3
FHST Update 3 3
LOSS of LOCK
SIGNIFICANT EVENTS:
HST resumed science gathering activities with a successful guide star
acquisition at about 121/0250z Gyro 1 continues to perform well, with
rate bias drift settling as expected.
- END OF FILE -
==========
@Message posted automagically by IMTHINGS POST 1.30
---
* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1)SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.