| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 4\29 Pt 3 HST Daily Rpt No 3351 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please!
~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
29 April 2003
HUBBLE SPACE TELESCOPE
DAILY REPORT # 3351
PERIOD COVERED: DOY 118
Part 3 of 3
STIS 9613
STIS CCD Spectroscopic Flats C11
Obtain CCD flats on the STIS CCD in spectroscopic mode.
STIS 9615
Cycle 11 MAMA Dark Monitor
This test performs the routine monitoring of the MAMA detector dark
noise. This proposal will provide the primary means of checking on
health of the MAMA detectors systems through frequent monitoring of
the background count rate. The purpose is to look for evidence of
change in dark indicative of detector problem developing.
NICMOS 9636
Cycle 11 NICMOS dark current, shading profile, and read noise
monitoring program
The purpose of this proposal is to monitor the dark current, read
noise, and shading profile for all three NICMOS detectors throughout
the duration of Cycle 11. This proposal is a continuation of PID 9321
which covers the period between the end of SMOV3B and the onset of
Cycle 11.
ACS 9659
Bias and dark dependence on CCD gains
ACS 9674
CCD Daily Monitor
This program consists of basic tests to monitor, the read noise, the
development of hot pixels and test for any source of noise in ACS CCD
detectors. This programme will be executed once a day for the entire
lifetime of ACS.
STIS 9708
STIS Pure Parallel Imaging Program: Cycle 11
WFPC2 9709
POMS Test Proposal: WFII parallel archive proposal
Proposal used to take parallel images of random areas of the sky,
following the recommendations of the 2002 Parallels Working Group.
FLIGHT OPERATIONS SUMMARY:
Significant Spacecraft Anomalies: (The following are preliminary
reports of potential non-nominal performance that will be
investigated.) None
COMPLETED OPS REQs: None
OPS NOTES EXECUTED: None
SCHEDULED SUCCESSFUL FAILURE TIMES
FGS GSacq 7 7
FGS REacq 7 7
FHST Update 20 20
LOSS of LOCK
SIGNIFICANT EVENTS:
Continue upgrade to STScI main routers with Giga-bit Ethernet
adapters 6 - 10 pm local. Upgrade gear from 155Mb ATM to Giga-bit
Ethernet. Install Giga-bit Ethernet modules in both main and backup
core routers. Interruptions should be no more that 15 - 20 minutes
and may occur several times between 6 and 10 pm local.
- END OF FILE -
==========
@Message posted automagically by IMTHINGS POST 1.30
---
* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1)SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.