| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\21 Germany - EUROCKOT`s MOM Daily No. 14 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MOM L-9 EUROCKOT's MOM Daily No. 14 Cosmodrome Plesetsk, June 21 (L-9): Looking at the countdown - only nine days left - excitement grows slowly, but steadily. In particular, as today was the last time we could see the spacecraft before encapsulation. Everything went according to plan. The fairing halves first where mated which each other (vertical split line) and then mated with the Upper Stage (horizontal split line). Pushers to rotate the fairing are integrated and the so called Upper Composite (Upper Stage, Fairing and payload) will be transferred into the General Hall of the MIK. Here, a hoisting structure and a passive thermal cover will be applied before the Upper Composite is lifted onto the dedicated railcar for the transport in vertical orientation out to the pad. During all that time the air within the payload fairing is controlled regarding temperature, humidity and cleanliness. All these operations will continue through Sunday to support a roll-out of the Upper Composite on Monday morning. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.