| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\20 Germany - EUROCKOT`s MOM Daily No. 13 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MOM L-10 EUROCKOT's MOM Daily No. 13 Cosmodrome Plesetsk, June 20 (L-10): The day started with a MOLNIYA launch in the morning (local time 00:00:37) which we could watch from an area close to our hotel. It was an impressive event, in particula as the visibility was very good. Later during the day, coming back to work on our launch vehicle, the last preparations for the encapsulation were performed. This included final adjustment of the Upper Stage thermal covers, electrical checks and the hoisting of the payload fairing halves into the encapsulation provision. This provision uses one basic structure and all three elements Upper Stage as well as the two fairing half shells can be moved very precise via mechanical, wheel driven mechanism. Thus, encapsulation will be performed very smooth without any risks, tomorrow. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.