| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\24 Germany - EUROCKOT`s MOM Daily No. 17 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MOM L-6 EUROCKOT's MOM Daily No. 17 Cosmodrome Plesetsk, June 24 (L-6): Sorry, no pictures, today. However, the Launch Vehicle processing went on according to schedule. It included removal of the passive thermal cover which was used during the transport to the pad, hoisting of the Upper Composite from the seventh level of the service tower onto the booster, removal of the hoisting devices, mechanical and electrical mating between booster and Upper Composite and mounting of the container extension which surrounds the Upper Stage and the lower part of the payload fairing. The spacecraft team has shifted its working place to the hotel, launch day procedures and documents are finally discussed and adjusted. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.