| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\23 Germany - EUROCKOT`s MOM Daily No. 16 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MOM L-7 EUROCKOT's MOM Daily No. 16 Cosmodrome Plesetsk, June 23 (L-7): The launch campaign slowly comes to its end. Today we had to say goodbye to the upper stage and the spacecraft in the MIK as the roll-out of the Upper Composite to the pad and the lifting operations into the seventh level of the service tower were performed today. Everything went extremely smooth and fully compliant with the schedule. On the first picture (Fig. 1) you can see the Upper Composite on its railcar close to the air-conditioning railcar providing air with the correct temperature, humidity and cleanliness during the complete ride to the pad. (Fig. 2) shows the train coming out of the Eurockot integration and office facility (MIK). After arrival of the train at the pad, the Upper Composite is brought on rails directly into the service tower, from where it is lifted by a crane. As this is certainly a hazardous operation because of the fuelled upper stage, everybody is provided with personal protection equipment, see below. During the next days the launch vehicle (LV) integration has to be completed with mechanical, electrical and fluid connection mating, as well as thorough check-outs before the LV can be fuelled. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.