| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 4\25 Ariane-5, flight-161, update |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Flight 161 April 25: A new Ariane 5 takes shape at the Spaceport The launch campaign for Arianespace's next mission began today as the Ariane 5 for Flight 161 started its build-up process in the Spaceport's integration building. Major elements for the Ariane arrived in French Guiana yesterday aboard the MN Colibri - one of two sea-going transport ships operated for Arianespace. The launcher elements were then transferred by road to the Spaceport, allowing the integration process to begin this morning. Flight 161 will be another dual-satellite mission for Ariane 5, carrying the Optus C1 spacecraft for Australia's Optus, and BSAT-2c for the Broadcasting Satellite System Corporation (B-SAT) of Japan. The large container with Ariane 5's cryogenic main stage was unloaded from the MN Colibri, which is docked at the Pariacabo port in Kourou. The MN Colibri carried the main elements of Flight 161's launch vehicle from Europe to French Guiana. Liftoff of Flight 161 with its dual satellite payload is scheduled for early June. Ariane 5's SYLDA 5 multiple payload deployment system left the MN Colibri on its way to the Spaceport during the unloading process that took place yesterday. Integration of SYLDA 5 with its two satellite payloads will be part of the final steps in Flight 161's launch campaign. The cryogenic core central stage was rotated to a vertical position in preparation for its positioning over the mobile launch table inside the Spaceport's Ariane 5 launcher integration building. The central stage will be mated with Ariane 5's two solid booster stages, followed by the installation of the vehicle equipment bay and the EPS upper stage. Once these steps are completed, the launcher is to be moved to the final assembly building, where the mission's two satellite payloads will be installed atop the vehicle. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.