| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\01 Russia - Multiple Orbit Mission Daily Report |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EUROCKOT's MOM Daily No. 5, 01-06-2003 MOM L-29 to L-27 EUROCKOT's MOM Daily No. 5 Cosmodrome Plesetsk, June 1 - 3 (L-29 to L-27): The Most spacecraft has been performing its last tests yesterday and today, e.g. tests of the telemetry and telecommand channels. As everything went according to schedule, it will be prepared for a short storage period including drying/purging operations beginning tomorrow until June 13 when the preparations for the mating with the dispenser will start. On June 2nd the NLS-1 and NLS-2 team arrived bringing with them the last of the NLS nanosatellites, see below. The NLS operations start today with unpacking of the S/C, GSE and office setup as well as first hardware tests. The ROCKOT launch vehicle is being processed according to schedule, which includes preparation of the upper stage and the fairing half shells in the cleanroom and check out of the booster stages. During the next days until June 13 there will be a reduced frequency of campaign reports, as mainly autonomous NLS-1/2 and MIMOSA spacecraft preparations will take place. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.