| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 8\18 India - INSAT-3E Launch Delayed. |
Husband, Mission Specialists Kalpana Chawla and Laurel Clark, and Payload Specialist Ilan Ramon of the Red Team began their workday about 5 a.m. CST, focusing again on work with the SOFBALL (Structures of Flame Balls) experiment and the ARMS (Advanced Respiratory Monitoring System) human physiology experiment. Husband maneuvered Columbia into the proper positions for the various experiments. The two teams have completed seven SOFBALL runs so far, including the first of several using methane as a fuel, which is visible to the naked eye as a faint blue flame. This evening, the Blue Team will attempt the longest planned test, lasting 2 hours, 47 minutes, while the shuttle is placed in a "free drift" configuration to eliminate thruster firings that could affect the test. Pilot Willie McCool and Mission Specialists Dave Brown and Michael Anderson of the Blue Team were awakened about 2:30 p.m. to the sounds of "Hotel California" performed by members of McCool's family. Their duty shift was scheduled to begin about 5 p.m. after a pre-bedtime handover from the Red Team. The Blue Team also will resume work with the Mechanics of Granular Materials experiment, looking at how sandy soil full of water behaves under pressure. Three compressions are planned over t ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.