| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 6\27 Germany - EUROCKOT`s MOM Daily No. 20 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MOM L-3 EUROCKOT's MOM Daily No. 20 Cosmodrome Plesetsk, June 27 (L-3): The State Commission, consisting in representatives from Eurockot, Khrunichev and the Space Forces met in the afternoon for the Launch Readiness Review. The review validated, that all systems (SC, LV, Launch Site, Ground Stations etc. .) are ready for the ROCKOT MOM launch on June 30th. Based on that finding, the command for fuelling of the launch vehicle was issued. Additionally, a small internal launch rehearsal was performed within the remote Mission Control Center MCC in Mirny. On Saturday afternoon, after the rest of the customer representatives will have arrived, there will be a another formal one. Everything is functional. The Eurockot MCC was built in 1999/2000 and provides high data rate connection to both the external world as well as to the integration and the launch facilities. The customer is provided with life video feed from the launch site as well as animated telemetry data on ascent parameter, event confirmation, ground track, orbit display and a full mission animation. Everything is still on GO for June 30. - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.