TIP: Click on subject to list as thread! ANSI
echo: sb-world_nws
to: All
from: Dan Dubrick
date: 2003-06-18 00:05:00
subject: 6\12 Germany - EUROCKOT`s MOM Daily No. 6

This Echo is READ ONLY !   NO Un-Authorized Messages Please!
 ~~~~~~~~~~~~~~~~~~~~~~~~   ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

EUROCKOT's MOM Daily No. 6

14 June 2003

MOM L-26 to L-18

All three spacecraft (CanX-1, AAU Cubesat and DTUsat), now contained
in the NLS-1 container (P-Pod) were processed and are ready for
integration with the upper stage adapter, they have to be trickle
charged periodically. The US team for the NLS-2 (Quakesat) spacecraft
will arrive tomorrow. 

Today a team of 14 Japanese space engineers and students from the
University of Tokyo and the Titech Institute, also in Tokyo, arrived.
They will prepare the two Japanese spacecraft Cube UT (CubeSat XI)
and Cube Titech (CUTE-1) within the next days. Today electrical and
mechanical interface checks were performed.

The MOST team is now completely present at the launch site to support
mating operations planned to begin on Saturday.

Meanwhile, the ROCKOT booster (stage 1 and 2) has been transported to
the launch pad and been erected. The BREEZE KM upper stage has
started its fuelling procedures in the bipropellant fuelling
facility.

 - END OF FILE -
==========

@Message posted automagically by IMTHINGS POST 1.30
--- 
* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1)
SEEN-BY: 633/267 270
@PATH: 153/719 715 7715 140/1 106/2000 633/267

SOURCE: echomail via fidonet.ozzmosis.com

Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.