| TIP: Click on subject to list as thread! | ANSI |
| echo: | |
|---|---|
| to: | |
| from: | |
| date: | |
| subject: | 7\03 Pt 3 ISS On-Orbit Status 03-07-2003 |
This Echo is READ ONLY ! NO Un-Authorized Messages Please! ~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 8 Jul 2003 ISS On-Orbit Status 3 Jul 2003 Part 3 of 3 U.S. and Russian Segment Status (as of 1:30pm EST). Environmental Control and Life Support (ECLSS) and Thermal Control (TCS): Elektron O2 generator is powered On (16 amp mode). Vozdukh CO2 scrubber is On (in Manual Mode 5/3). U.S. CDRA CO2 scrubber is Off. TCCS (trace contaminant control subsystem) is operating. MCA (major constituents analyzer) is operating. BMP Harmful Impurities unit: absorbent bed #1 in Purify mode, bed #2 in Purify mode (unit is off). RS air conditioner SKV-1 is On; SKV-2 is Off. SM Working Compartment: Pressure (mmHg) -- 742; temperature (deg C) -- 27.0; ppO2 (mmHg) -- data invalid ; ppCO2 (mmHg) -- data invalid . SM Transfer Compartment: Pressure (mmHg) -- 751; temperature (deg C) -- 20.4. FGB Cabin: Pressure (mmHg) -- 752; temperature (deg C) -- 22.3. Node: Pressure (mmHg) -- 741.98; temperature (deg C) -- 22.4 (shell); ppO2 (mmHg) -- 171.2; ppCO2 (mmHg) -- 4.6. U.S. Lab: Pressure (mmHg) -- 743.81; temperature (deg C) -- 23.2; ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a. Joint Airlock (Equip. Lock): Pressure (mmHg) -- 743.81; temperature (deg C) -- 24.8; shell heater temp (deg C) -- 22.0, ppO2 (mmHg) -- n/a; ppCO2 (mmHg) -- n/a. PMA-1: Shell heater temp (deg C) -- 23.5 PMA-2: Shell heater temp (deg C) -- 21.8. (n/a = data not available) Propulsion System (PS): Total propellant load available: 3803 kg (8384 lb) as of 6/26 [SM(774) + FGB(2447) + Progress M(182) +Progress M-1(400)]. (Capability: SM -- 860 kg; FGB -- 6120 kg). Electrical Power Systems (EPS): Both P6 channels fully operational. BGA (beta gimbal assembly) 2B and 4B both in directed position (Blind mode, non solar-tracking, drag reduction).. SM batteries: Battery #4 is disconnected (failed 6/16); battery #8 is in "Cycle" mode; all other batteries (6) are in "Partial Charge" mode. Batteries #1, #2 and #3 showing degraded capacity. FGB batteries: Battery #3 is offline; all other batteries (5) are in "Partial Charge" mode. Plasma Contactor Unit PCU-1 in Standby mode; PCU-2 in Discharge mode. Command & Data Handling Systems: C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby. GNC-1 MDM is prime; GNC-2 is Backup. INT-1 is operating; INT-2 is Off. EXT-2 is On (primary), EXT-1 is Off (both now upgraded to R3). LA-1, LA-2 and LA-3 MDMs are all operating. PL-2 MDM is Off; PL-1 MDM is Operational. APS-1 (automated payload switch #1) and APS-2 are both On. SM Terminal Computer (TVM): 3 redundant lanes (of 3) operational. SM Central Computer (TsVM): 3 redundant lanes (of 3) operational. Attitude Control Systems: 3 CMGs on-line (CMG-1 failed). State vector source -- U.S. SIGI-1 (GPS) Attitude source -- U.S. SIGI-1 (GPS) Angular rate source -- RGA-1 Flight Attitude: LVLH -YVV (local vertical/local horizontal = "earth-fixed": z-axis in local vertical, -y-axis in velocity vector [yaw: -10 deg, pitch: -9.3 deg, roll: 0 deg]), with CMG/TA (thruster assist) Momentum Management. Solar Beta angle: 2.43 deg (magnitude increasing). Communications & Tracking Systems: FGB MDM-1 is powered Off; FGB MDM-2 is operational. All other Russian communications & tracking systems are nominal. S-band is operating nominally (on string 2). Ku-band is operating nominally. Audio subsystem is operating nominally [IAC-1 (internal audio controller #1) being analyzed after self-test error. IAC-2 is prime.] Video subsystem operating nominally. HCOR (high-rate communications outage recorder) is operating nominally. Robotics: SSRMS/Canadarm2 based at MBS PDGF #1 with Keep Alive (KA) power on both strings. MBS: KA power on both strings. MT: latched and mated at WS4. POA: KA power on both strings. RWS (robotics workstations): Lab RWS is On (DCP connected); Cupola RWS is Off. ISS Orbit (as of this morning, 6:48am EDT [= epoch]): Mean altitude -- 387.3 km Apogee -- 392.5 km Perigee -- 382.0km Period -- 92.30 min. Inclination (to Equator) -- 51.63 deg Eccentricity -- 0.0007737 Orbits per 24-hr. day -- 15.60 Solar Beta Angle -- 2.43 deg (magnitude increasing) Mean altitude loss in last 24 hours -- 90 m Revolutions since FGB/Zarya launch (Nov. '98) -- 26354 For more on ISS orbit and worldwide naked-eye visibility dates/times, see http://www.hq.nasa.gov/osf/station/viewing/issvis.html - END OF FILE - ========== @Message posted automagically by IMTHINGS POST 1.30 ---* Origin: SpaceBase(tm) Pt 1 -14.4- Van BC Canada 604-473-9358 (1:153/719.1) SEEN-BY: 633/267 270 @PATH: 153/719 715 7715 140/1 106/2000 633/267 |
|
| SOURCE: echomail via fidonet.ozzmosis.com | |
Email questions or comments to sysop@ipingthereforeiam.com
All parts of this website painstakingly hand-crafted in the U.S.A.!
IPTIA BBS/MUD/Terminal/Game Server List, © 2025 IPTIA Consulting™.